Foot protection method Product List and Ranking from 4 Manufacturers, Suppliers and Companies

Foot protection method Product List

1~13 item / All 13 items

Displayed results

Pre-boring expansion grouting method "Hyper-Straight Method"

A construction method that can accommodate various ground conditions, with high load-bearing capacity and low cost.

The "Hyper-Straight Method" involves pre-drilling the ground with an auger, followed by the injection of solidification liquid and pile surrounding fixation liquid, allowing the pile to be inserted into the designated support layer by self-sinking or rotation, achieving a depth of 1D or more. Using a drilling and mixing device composed of an auger head, screw, mixing rod, and connecting rod, the construction process follows the steps from drilling to the injection of solidification liquid, repeated solidification above and below, injection of pile surrounding fixation liquid, repeated fixation above and below, and finally pile insertion and installation. Additionally, by implementing a construction management system that supports high precision and efficiency, real-time management of the solidification bulb and support layer is conducted to ensure quality. 【Features】 ■ Easy construction management due to full-length straight drilling ■ No need for specialized under-pinning unique to high bearing capacity ■ A mid-bearing capacity method conceived by returning to the origins of precast concrete pile methods *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel pipe pile middle excavation expansion root solidification method "FB9 method"

Reliable vertical support and secure foundation construction! It is an eco-friendly method.

The "FB9 method" is a construction technique that mechanically expands and excavates the supporting ground at the tip of steel pipe piles, creating an enlarged foundation bulb using a cement milk jet mixing method. This method has been recognized as having equal or greater bearing capacity than the intermediate excavation piles specified in the road bridge guidelines. The soil and sand discharged during the intermediate excavation can be treated as construction-generated soil, preventing secondary pollution. Additionally, it is a low-pollution method with low noise and vibration levels. 【Features】 ■ Environmental conservation ■ Reliable anchoring to the enlarged foundation bulb at the pile tip ■ High excavation efficiency ■ Integrity between the steel pipe pile and the tip bulb ■ Fast continuous construction *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-boring root solidification method "Super FK Method"

Introducing the Pre-Boring Ground Stabilization Method: Achieving Excellent Functionality, Safety, and Cost-Effectiveness!

The "Super FK Method" is a pre-boring foundation method that eliminates concerns about high stopping and ensures that the pile tip is securely anchored within the designated ground. The construction process is not complicated, making construction management easy, and it incorporates an expansion function into the injection fluid, allowing for high friction resistance. Additionally, we handle the "YP-FK pile," which has been certified as JIS A 5373 (Japanese Industrial Standards). 【Features】 ■ Easy insertion of piles ■ Ensures secure anchoring of the pile tip within the designated ground ■ Simple construction process and easy management ■ Low noise and low vibration ■ Can be used as support piles *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-boring expansion grouting method "Kemun Method/ST Kemun Method"

Construction Minister certified construction method! Pre-boring expansion grouting method that can be securely anchored to the support layer.

The "Kemun Method/ST Kemun Method" is a pre-boring expansion grouting method that adapts to various ground conditions and ensures reliable anchoring to the bearing layer. The "Kemun Method" allows for construction using small-diameter to large-diameter piles, and by injecting pile fixing fluid along the entire circumference of the pile, friction can be expected. The "ST Kemun Method" can address horizontal forces by combining PHC piles of types B and C, PRC piles, SC piles, etc., with the upper piles. 【Features of the Kemun Method】 ■ Low vibration and low noise construction ■ Reliable anchoring of piles to the bearing layer ■ Construction possible from small-diameter to large-diameter piles ■ Adaptable to various ground conditions ■ Extremely low soil displacement compared to conventional cement milk methods *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-boring expansion grouting method "G-Lock Method"

Improved construction efficiency! A pre-boring method that achieves reliability in construction and high support strength.

The "G-Lock Method" involves straight drilling, making the excavation process simple and improving construction efficiency through a pre-boring expansion grouting method. Since the tip of the pile's grouting section is inserted 5D (D: pile diameter) into the supporting layer (N value of 30 or more), the pile's bearing capacity coefficient α=348 is significantly high, ensuring reliable bearing capacity. By using an excavation mixing device, the injection fluid is mixed with the ground, allowing for a reduction in the amount of excavated residual soil. 【Features】 ■ Improved construction efficiency ■ Straight drilling ■ Reliable high bearing capacity ■ Enhanced construction quality and easier construction management ■ Reduction of excavated soil volume *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hyper-NAKS II Method for Expanding and Reinforcing Underground Excavation

An evolved version of the middle excavation expansion foundation method, ensuring high reliability through an advanced construction management system!

The "Hyper-NAKS II Method" is classified as an embedded pile method using precast concrete piles, specifically the middle excavation and expansion foundation method. With the hydraulic mechanism, the starting position for wing expansion and the position for fixed liquid injection around the pile can be confirmed in real-time by the construction management device. Additionally, since it allows for the construction of the bulb section in a clockwise direction, it increases the soil discharge rate within the bulb section, enabling the construction of high-quality bulbs. 【Features】 ■ Dramatic increase in bearing capacity ■ Maximum pile diameter is φ1200mm ■ Maximum construction depth exceeds 70m ■ Foundation bulb structure using hydraulic expansion bits ■ Adoption of a new construction management system that ensures workability and reliability *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Underground Expansion Foundation Method "STJ Method"

Construction is possible up to 80m! It is a low noise, low vibration method.

The "STJ Method" is a construction method for precast concrete piles that falls under the category of low-noise and low-vibration methods for the middle excavation and enlarged root solidification. By switching the auger's rotation to a low speed and jetting cement milk from high-pressure injection nozzles in two directions while raising the auger at a constant speed, a reliable enlarged bulb is constructed. 【Features】 ■ Reliable construction of enlarged bulbs ■ High bearing capacity ■ Rapid construction ■ Low construction costs ■ Low earth discharge method *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-boring expansion grouting method "Kemun Method / ST Kemun Method"

Construction Minister certified construction method! It is a method that makes construction management easy and simple.

The "Kemun Method / ST Kemun Method" is a low-vibration, low-noise construction method that can securely anchor to the supporting layer and adapt to various ground conditions. While excavating and mixing, water or a pile surrounding fixation fluid is injected from the tip of the drilling bit. Once the desired depth is reached, a specified amount of solidification fluid is injected to construct the solidified bulb section. Next, the excavation mixing shaft is pulled up while injecting the pile surrounding fixation fluid. In this way, a pile is inserted into the excavated hole and positioned at the desired location by self-sinking or rotation. 【Features (Common)】 ■ Low noise, low vibration method ■ By rotating the pile, it can be securely anchored to the supporting layer ■ The pile surrounding fixation fluid is injected along the entire length of the pile surface, allowing for expected friction ■ Wide range of applicable ground conditions ■ The solidification fluid contains a leakage prevention agent, resulting in a high-quality expanded solidified bulb section *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

STJ Method for Expanding and Reinforcing Underground Excavation

Since continuous work can be done with one machine, the construction efficiency is good and the construction cost is low.

The "STJ Method" is a construction technique that integrates the pile body and the bulb by hardening the ground improvement liquid that is injected at high pressure into the tip of the pile, thereby realizing the pile's bearing capacity. The construction uses a spiral auger equipped with an STJ bit, installing the pile through a middle excavation utilizing the hollow part of the pile, and jetting cement milk with a high-pressure pump to create an enlarged bulb, resulting in low noise and low vibration. 【Features】 ■ Reliable construction of enlarged bulbs ■ High bearing capacity ■ Rapid construction ■ Low construction costs ■ Low earth-displacement method *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-boring foundation stabilization method "NEW Super FK Method"

Supports a wide range of variations! Simple construction that meets the needs of the times.

The "NEW Super FK Method" is a pre-boring ground improvement method that integrates the foundation with the ground using segmental piles to develop bearing capacity. Since it involves straight excavation, the construction process is not complicated, which improves construction efficiency. Additionally, high blast furnace cement is used for the pile-fixing fluid and the ground improvement fluid, contributing to a circular economy through resource recycling. 【Features】 ■ By using an expansive admixture in the injection fluid, high frictional force is generated. ■ Pile sizes can accommodate from 300450 to 10001200. ■ Connection between intermediate and upper piles is possible for three types of pile diameters (shaft diameter, intermediate diameter, and segment diameter). *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

STJ Method for Expanding and Reinforcing Underground Excavation

Excavated soil is natural soil! A reliable method for constructing expanded bulb foundations through the middle excavation and reinforcement technique.

The "STJ Method" is a construction technique that involves high-pressure injection of cement milk from an STJ bit to create an enlarged bulb, integrating it with the ground to develop bearing capacity. By switching the auger's rotation to a low speed and jetting cement milk from two high-pressure injection nozzles while pulling it up at a constant speed, it is possible to reliably construct an enlarged bulb. Compared to the pre-boring method, it is a low-discharge method, and the discharged soil is natural soil, contributing to a circular economy. 【Features】 ■ Low noise and low vibration method ■ Reliable construction of enlarged bulbs ■ High bearing capacity ■ Rapid construction ■ Low construction costs *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-boring expansion grouting method "Hyper-Straight Method"

Simple construction! Pre-boring enlarged foundation method using standard prefabricated concrete piles.

The "Hyper-Straight Method" is a pre-boring expansion solidification method where the ground is first excavated using an auger, followed by the injection of solidification liquid and pile surrounding fixation liquid, allowing the pile to be inserted into the designated support layer by self-sinking or rotation to a depth of 1D or more. Using a drilling and mixing device composed of an auger head, screw, mixing rod, and connecting rod, the construction is carried out through a sequence of steps from excavation to the injection of solidification liquid, repeated solidification of the solidified section, injection of pile surrounding fixation liquid, repeated fixation of the surrounding section, and installation of the pile. Additionally, by introducing a construction management system that supports high precision and efficiency, real-time management of the solidification bulb section and support layer is conducted to ensure quality. 【Features】 ■ Pile tip bearing capacity coefficient α=363 ■ Simple construction ■ Use of standard precast concrete piles ■ High bearing capacity at low cost ■ Construction management *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-boring expansion grouting method "High Beam Method"

Proposal for "High Support Capacity Pile Design" with consideration for the environment! Introduction of the Pre-Boring Expansion Foundation Method.

The "High Bearing Capacity Pile Method (H・B・M)" enables the reduction of pile diameter and the number of piles used through high bearing capacity pile design, achieving a shortened construction period for foundation work and a reduction in excavated soil. By adopting HB piles with enlarged diameters, it obtains the specified values of the astonishingly high bearing capacity coefficients α, β, and γ (as per the Ministry of Land, Infrastructure, Transport and Tourism Notification No. 1113). To match the large ground bearing capacity, ultra-high-strength concrete piles with a strength of over 105 N/mm² have been developed, and a group of manufacturing factories affiliated with the association provides high-quality products. 【Features】 ■ Ensures ultimate α, β, and γ values ■ Constructs environmentally friendly foundations ■ High-quality construction covering all of Japan ■ Concrete pile materials entering a new era ■ 8 types of selection variations *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Search Keywords Related to Foot protection method